Triple

T28130485
Position Surface form Disambiguated ID Type / Status
Subject Uruguay River hydroelectric cascade E711051 entity
Predicate hasComponent P35 FINISHED
Object Barra Grande Dam
Barra Grande Dam is a major hydroelectric dam in southern Brazil, built on the Pelotas River to generate power as part of the Uruguay River basin’s energy infrastructure.
E1847811 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barra Grande Dam | Statement: [Uruguay River hydroelectric cascade, hasComponent, Barra Grande Dam]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Barra Grande Dam
Triple: [Uruguay River hydroelectric cascade, hasComponent, Barra Grande Dam]
Generated description
Barra Grande Dam is a major hydroelectric dam in southern Brazil, built on the Pelotas River to generate power as part of the Uruguay River basin’s energy infrastructure.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef9b73bd288190a21ae3d6aa14f386 completed April 27, 2026, 5:22 p.m.
NER Named-entity recognition batch_69f64129a18c819083e67589ae2d8368 completed May 2, 2026, 6:23 p.m.
NED1 Entity disambiguation (via context triple) batch_6a251f4220448190920ea22955f0dba0 completed June 7, 2026, 7:35 a.m.
NEDg Description generation batch_6a25242352f08190805e663c6bb680cc completed June 7, 2026, 7:56 a.m.
NED2 Entity disambiguation (via description) batch_6a2527e117c88190989c7965f5d99f87 completed June 7, 2026, 8:12 a.m.
Created at: April 27, 2026, 9:22 p.m.