Triple

T27864301
Position Surface form Disambiguated ID Type / Status
Subject Ōi River E704313 entity
Predicate hasHydroelectricFacilityOn P58561 FINISHED
Object Nagashima Dam
Nagashima Dam is a hydroelectric dam on Japan’s Ōi River, used for power generation and water management.
E1792033 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nagashima Dam | Statement: [Ōi River, hasHydroelectricFacilityOn, Nagashima Dam]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Nagashima Dam
Triple: [Ōi River, hasHydroelectricFacilityOn, Nagashima Dam]
Generated description
Nagashima Dam is a hydroelectric dam on Japan’s Ōi River, used for power generation and water management.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasHydroelectricFacilityOn
Context triple: [Ōi River, hasHydroelectricFacilityOn, Nagashima Dam]
  • A. hasHydropowerRoleIn
    Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
  • B. hasHydroelectricInfrastructureNearby
    Indicates that there is hydroelectric infrastructure located in close proximity to the referenced entity.
  • C. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • D. isHydroelectricallyDeveloped
    Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
  • E. isHydroelectricProjectOn chosen
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840f12408190b539d00d79658abf completed April 27, 2026, 3:43 p.m.
NER Named-entity recognition batch_69f63946708881908e441f37c8bd6fee completed May 2, 2026, 5:49 p.m.
NED1 Entity disambiguation (via context triple) batch_6a12f74720a48190bf675712185271bb completed May 24, 2026, 1:04 p.m.
NEDg Description generation batch_6a12fb4b45608190b9ce61a072e783aa completed May 24, 2026, 1:21 p.m.
NED2 Entity disambiguation (via description) batch_6a12fbc87d94819097dbb89898b6ba03 completed May 24, 2026, 1:23 p.m.
PD Predicate disambiguation batch_69f6318ae6f08190b3f85f9201046a15 completed May 2, 2026, 5:16 p.m.
Created at: April 27, 2026, 6:19 p.m.