Triple

T27840956
Position Surface form Disambiguated ID Type / Status
Subject mainline U.S. Route 74 around Shelby, North Carolina E703677 entity
Predicate connectsTo P845 FINISHED
Object U.S. Route 74 east of Shelby, North Carolina
U.S. Route 74 east of Shelby, North Carolina is a segment of the major east–west U.S. highway that continues from the Shelby bypass toward Charlotte and other destinations in the Piedmont region.
E703677 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 74 east of Shelby, North Carolina | Statement: [mainline U.S. Route 74 around Shelby, North Carolina, connectsTo, U.S. Route 74 east of Shelby, North Carolina]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: U.S. Route 74 east of Shelby, North Carolina
Triple: [mainline U.S. Route 74 around Shelby, North Carolina, connectsTo, U.S. Route 74 east of Shelby, North Carolina]
Generated description
U.S. Route 74 east of Shelby, North Carolina is a segment of the major east–west U.S. highway that continues from the Shelby bypass toward Charlotte and other destinations in the Piedmont region.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840d9e3c819093615ebff4ec22be completed April 27, 2026, 3:43 p.m.
NER Named-entity recognition batch_69f638d613b081909ee344974d3b1194 completed May 2, 2026, 5:48 p.m.
NED1 Entity disambiguation (via context triple) batch_6a13034767888190a7317b8baf7895b5 completed May 24, 2026, 1:55 p.m.
NEDg Description generation batch_6a1303e852488190ad34cae264ed7752 completed May 24, 2026, 1:58 p.m.
NED2 Entity disambiguation (via description) batch_6a130498a5748190bf5560d2cc95f478 completed May 24, 2026, 2 p.m.
Created at: April 27, 2026, 6:03 p.m.