Triple

T27590257
Position Surface form Disambiguated ID Type / Status
Subject IPMI E699774 entity
Predicate canOperateWhen P15906 FINISHED
Object main CPU is powered off LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: main CPU is powered off | Statement: [IPMI, canOperateWhen, main CPU is powered off]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: canOperateWhen
Context triple: [IPMI, canOperateWhen, main CPU is powered off]
  • A. canOperateAt
    Indicates that one entity has the capability, permission, or suitability to function or perform its role at, within, or under the conditions of another entity or context.
  • B. canOperateUnder chosen
    Indicates that one entity is permitted, able, or qualified to function, perform, or remain active within the conditions, authority, or environment defined by another entity.
  • C. mayBeOperatedBy
    Indicates that an entity has the potential or permission to be operated, controlled, or run by another entity.
  • D. canOperateInMultiple
    Indicates that an entity is capable of functioning or being used across more than one context, environment, or mode.
  • E. canUse
    Indicates that one entity has the ability, permission, or suitability to make use of another entity or resource.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4d71f081909a1235763206b691 completed April 27, 2026, 1:53 p.m.
NER Named-entity recognition batch_69f63052e1dc8190a77ac942cdcc4a63 completed May 2, 2026, 5:11 p.m.
PD Predicate disambiguation batch_69f62c1921008190a62675a31f66a875 completed May 2, 2026, 4:53 p.m.
Created at: April 27, 2026, 2:05 p.m.