Triple
T27488800
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cherepish railway bridges |
E693821
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail viaducts |
C4025
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail viaducts Context triple: [Cherepish railway bridges, instanceOf, rail viaducts]
-
A.
stone viaduct
A stone viaduct is a long, elevated structure composed of a series of stone arches or spans that carries a road or railway across a valley, river, or other low-lying terrain.
-
B.
railway bridge
chosen
A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
-
C.
railroad bridge
A railroad bridge is a specialized structure that carries railway tracks over obstacles such as roads, rivers, valleys, or other rail lines, ensuring safe and continuous train passage.
-
D.
combined road and rail bridge–tunnel
A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
-
E.
road and rail bridge
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef5382b9648190be0b1ef2ad5d043c |
completed | April 27, 2026, 12:16 p.m. |
Created at: April 27, 2026, 1:04 p.m.