Triple

T27452792
Position Surface form Disambiguated ID Type / Status
Subject A13 motorway E692493 entity
Predicate isPartOfCorridor P35 FINISHED
Object north–south inland corridor of Portugal
The north–south inland corridor of Portugal is a major transportation axis running along the country’s interior, linking northern and southern regions through a network of motorways and roads such as the A13.
E1771858 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: north–south inland corridor of Portugal | Statement: [A13 motorway, isPartOfCorridor, north–south inland corridor of Portugal]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: north–south inland corridor of Portugal
Triple: [A13 motorway, isPartOfCorridor, north–south inland corridor of Portugal]
Generated description
The north–south inland corridor of Portugal is a major transportation axis running along the country’s interior, linking northern and southern regions through a network of motorways and roads such as the A13.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5206c9248190b5975c2a7f9d229c completed April 27, 2026, 12:09 p.m.
NER Named-entity recognition batch_69f62dc69f1481908717ae77e60d9658 completed May 2, 2026, 5 p.m.
NED1 Entity disambiguation (via context triple) batch_6a12b260e6f481909076075270653c1c completed May 24, 2026, 8:10 a.m.
NEDg Description generation batch_6a12b32353248190ac509d73a9910602 completed May 24, 2026, 8:13 a.m.
NED2 Entity disambiguation (via description) batch_6a12b3c695a0819099113dba54710362 completed May 24, 2026, 8:16 a.m.
Created at: April 27, 2026, 12:48 p.m.