Triple

T27172168
Position Surface form Disambiguated ID Type / Status
Subject Huila E682946 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Betania Hydroelectric Power Plant
Betania Hydroelectric Power Plant is a major hydroelectric facility in Colombia that generates electricity by harnessing the waters of the Magdalena River in the department of Huila.
E1760277 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Betania Hydroelectric Power Plant | Statement: [Huila, hasHydroelectricPlant, Betania Hydroelectric Power Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Betania Hydroelectric Power Plant
Triple: [Huila, hasHydroelectricPlant, Betania Hydroelectric Power Plant]
Generated description
Betania Hydroelectric Power Plant is a major hydroelectric facility in Colombia that generates electricity by harnessing the waters of the Magdalena River in the department of Huila.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eefad086808190ab89816c0c300476 completed April 27, 2026, 5:57 a.m.
NER Named-entity recognition batch_69f62547f92c8190818a05f9836a0843 completed May 2, 2026, 4:24 p.m.
NED1 Entity disambiguation (via context triple) batch_6a125388d6a0819092971a404f7992c5 completed May 24, 2026, 1:25 a.m.
NEDg Description generation batch_6a12546f814881908c806a1805b7473d completed May 24, 2026, 1:29 a.m.
NED2 Entity disambiguation (via description) batch_6a125512eb608190b958f82af3475535 completed May 24, 2026, 1:32 a.m.
Created at: April 27, 2026, 9:24 a.m.