Triple
T26955548
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shulbinsk Reservoir |
E678891
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Irtysh River water management system
The Irtysh River water management system is an integrated network of reservoirs, dams, and related hydraulic infrastructure designed to regulate the flow, storage, and use of water along the Irtysh River basin.
|
E1751028
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Irtysh River water management system | Statement: [Shulbinsk Reservoir, partOf, Irtysh River water management system]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Irtysh River water management system Triple: [Shulbinsk Reservoir, partOf, Irtysh River water management system]
Generated description
The Irtysh River water management system is an integrated network of reservoirs, dams, and related hydraulic infrastructure designed to regulate the flow, storage, and use of water along the Irtysh River basin.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb4e75f08190b14fc91ca4a91488 |
completed | April 27, 2026, 4:51 a.m. |
| NER | Named-entity recognition | batch_69f620e817a48190bdc81ec39833245a |
completed | May 2, 2026, 4:06 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a12299b3f088190b69ad30d47afd7e9 |
completed | May 23, 2026, 10:26 p.m. |
| NEDg | Description generation | batch_6a122a9dabb081908ed47a5d4624d9c6 |
completed | May 23, 2026, 10:30 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a122b4b3c488190b95edec5469dfd71 |
completed | May 23, 2026, 10:33 p.m. |
Created at: April 27, 2026, 6:27 a.m.