Triple
T26929899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lule River hydropower system |
E678184
|
entity |
| Predicate | majorComponent |
P15759
|
FINISHED |
| Object |
Letsi Hydroelectric Power Station
Letsi Hydroelectric Power Station is a significant hydroelectric facility in Sweden that contributes substantial renewable electricity generation as part of the Lule River power system.
|
E1752608
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Letsi Hydroelectric Power Station | Statement: [Lule River hydropower system, majorComponent, Letsi Hydroelectric Power Station]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Letsi Hydroelectric Power Station Triple: [Lule River hydropower system, majorComponent, Letsi Hydroelectric Power Station]
Generated description
Letsi Hydroelectric Power Station is a significant hydroelectric facility in Sweden that contributes substantial renewable electricity generation as part of the Lule River power system.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb4cac908190a45956c2993d1cc2 |
completed | April 27, 2026, 4:51 a.m. |
| NER | Named-entity recognition | batch_69f62048ae408190b8be4222d537e3f3 |
completed | May 2, 2026, 4:03 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a1229958f008190b5dad4bb5299d477 |
completed | May 23, 2026, 10:26 p.m. |
| NEDg | Description generation | batch_6a122ab3c688819090346bce8a20c061 |
completed | May 23, 2026, 10:31 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a122bf0a15c81909e479281bb9e7d73 |
completed | May 23, 2026, 10:36 p.m. |
Created at: April 27, 2026, 6:11 a.m.