Triple

T26854396
Position Surface form Disambiguated ID Type / Status
Subject Carrick-on-Shannon railway station E676146 entity
Predicate owner P347 FINISHED
Object Iarnród Éireann E615349 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iarnród Éireann | Statement: [Carrick-on-Shannon railway station, owner, Iarnród Éireann]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9b9d7708190a15d7485709ae981 completed April 27, 2026, 4:44 a.m.
NER Named-entity recognition batch_69f61b94b4a88190b24e8955029ec64e completed May 2, 2026, 3:43 p.m.
NED1 Entity disambiguation (via context triple) batch_6a121e88a55c8190a24d0b0dc2552ca3 completed May 23, 2026, 9:39 p.m.
Created at: April 27, 2026, 5:20 a.m.