Triple

T26783948
Position Surface form Disambiguated ID Type / Status
Subject Canberra active travel network E670326 entity
Predicate instanceOf P0 FINISHED
Object walking infrastructure network C12185 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: walking infrastructure network
Context triple: [Canberra active travel network, instanceOf, walking infrastructure network]
  • A. pedestrian network chosen
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • B. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • C. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • D. national cycling infrastructure
    National cycling infrastructure is the integrated network of bike paths, lanes, facilities, and supporting policies designed at a country-wide level to enable safe, efficient, and accessible cycling for transportation and recreation.
  • E. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb31d45f8819089f52ebdbc556218 completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 4:11 a.m.