Triple
T26681479
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cape Cod Canal service road (multi-use path) |
E672624
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | paved path |
C2290
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: paved path Context triple: [Cape Cod Canal service road (multi-use path), instanceOf, paved path]
-
A.
stone-paved track
A stone-paved track is a pathway or road surface constructed from closely fitted stones to provide a durable, stable route for travel or transport.
-
B.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
C.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
D.
walking path
chosen
A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
-
E.
covered walkway
A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eecda13424819092b17942c4edf722 |
completed | April 27, 2026, 2:44 a.m. |
Created at: April 27, 2026, 3:20 a.m.