Triple

T26646275
Position Surface form Disambiguated ID Type / Status
Subject ED E668916 entity
Predicate associatedWithLine P45024 FINISHED
Object Utrecht–Arnhem railway line
The Utrecht–Arnhem railway line is a major Dutch rail corridor connecting the central city of Utrecht with Arnhem in the eastern Netherlands, serving both national and international train services.
E1846890 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Utrecht–Arnhem railway line | Statement: [ED, associatedWithLine, Utrecht–Arnhem railway line]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Utrecht–Arnhem railway line
Triple: [ED, associatedWithLine, Utrecht–Arnhem railway line]
Generated description
The Utrecht–Arnhem railway line is a major Dutch rail corridor connecting the central city of Utrecht with Arnhem in the eastern Netherlands, serving both national and international train services.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9d00eb5481908d6c6d0ada2f0c9a completed April 26, 2026, 11:17 p.m.
NER Named-entity recognition batch_69f61675230c8190b86209ef1beeaf87 completed May 2, 2026, 3:21 p.m.
NED1 Entity disambiguation (via context triple) batch_6a251f3e2f748190ae3480664af84d95 completed June 7, 2026, 7:35 a.m.
NEDg Description generation batch_6a2523c42870819080405feb80019d83 completed June 7, 2026, 7:54 a.m.
NED2 Entity disambiguation (via description) batch_6a252484db5081909a9f337bb31abc2c completed June 7, 2026, 7:57 a.m.
Created at: April 27, 2026, 2:31 a.m.