Triple

T26481011
Position Surface form Disambiguated ID Type / Status
Subject Goulburn Valley Highway E664682 entity
Predicate formerRouteNumber P22310 FINISHED
Object National Highway 39
National Highway 39 was a former Australian national highway designation that once formed part of the route now known as the Goulburn Valley Highway in Victoria.
E2297445 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Highway 39 | Statement: [Goulburn Valley Highway, formerRouteNumber, National Highway 39]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: National Highway 39
Triple: [Goulburn Valley Highway, formerRouteNumber, National Highway 39]
Generated description
National Highway 39 was a former Australian national highway designation that once formed part of the route now known as the Goulburn Valley Highway in Victoria.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883bc85481909885f92415cbce33 completed April 26, 2026, 9:48 p.m.
NER Named-entity recognition batch_69f612fafa5481908a921332952b448f completed May 2, 2026, 3:06 p.m.
NED1 Entity disambiguation (via context triple) batch_6a838409040c8190a5cbba57fa94d336 completed Aug. 17, 2026, 9:58 p.m.
NEDg Description generation batch_6a83846016088190ad9531e80504b52b completed Aug. 17, 2026, 10 p.m.
NED2 Entity disambiguation (via description) batch_6a8384caff348190870b34828cc98c9b completed Aug. 17, 2026, 10:01 p.m.
Created at: April 27, 2026, 12:27 a.m.