Triple
T26347524
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lotus ScreenCam |
E662815
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | software demonstration tool |
C112
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: software demonstration tool Context triple: [Lotus ScreenCam, instanceOf, software demonstration tool]
-
A.
computer demonstration
chosen
A computer demonstration is a guided presentation that uses a computer system to visually and interactively showcase how software, hardware, or digital processes work.
-
B.
demonstration
A demonstration is a structured presentation or display of how something works, is performed, or can be used, typically to explain, prove, or showcase its features or effectiveness.
-
C.
demonstration device
A demonstration device is a tangible or virtual tool specifically designed to illustrate, explain, or showcase how a concept, process, or system works in an accessible and observable way.
-
D.
graphical tool
A graphical tool is a software application or component that enables users to create, edit, or manipulate visual elements and diagrams through an interactive graphical interface.
-
E.
prototyping tool
A prototyping tool is a software application or platform that enables users to quickly create, visualize, and test interactive mockups or early versions of products, interfaces, or systems before full-scale development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee8130fc44819094e5ab1da201cd7b |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:43 p.m.