Triple

T26302936
Position Surface form Disambiguated ID Type / Status
Subject Kingston coal ash spill of 2008 E661604 entity
Predicate preceded P97 FINISHED
Object Dan River coal ash spill of 2014
The Dan River coal ash spill of 2014 was a major environmental disaster in North Carolina in which a ruptured stormwater pipe at a Duke Energy power plant released tens of thousands of tons of coal ash and contaminated wastewater into the Dan River.
E1724582 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dan River coal ash spill of 2014 | Statement: [Kingston coal ash spill of 2008, preceded, Dan River coal ash spill of 2014]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Dan River coal ash spill of 2014
Triple: [Kingston coal ash spill of 2008, preceded, Dan River coal ash spill of 2014]
Generated description
The Dan River coal ash spill of 2014 was a major environmental disaster in North Carolina in which a ruptured stormwater pipe at a Duke Energy power plant released tens of thousands of tons of coal ash and contaminated wastewater into the Dan River.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee812cd48c81908054068f545f0526 completed April 26, 2026, 9:18 p.m.
NER Named-entity recognition batch_69f60eb396788190a225665a56568d2c completed May 2, 2026, 2:48 p.m.
NED1 Entity disambiguation (via context triple) batch_6a11aea64c80819096faec0e9369f8f5 completed May 23, 2026, 1:41 p.m.
NEDg Description generation batch_6a11afe7f1f0819097ec0208368b6409 completed May 23, 2026, 1:47 p.m.
NED2 Entity disambiguation (via description) batch_6a11b0a521b08190bfda23906722482c completed May 23, 2026, 1:50 p.m.
Created at: April 26, 2026, 10:17 p.m.