Triple

T26270105
Position Surface form Disambiguated ID Type / Status
Subject Naval Construction Group 1 E657096 entity
Predicate instanceOf P0 FINISHED
Object naval construction force command C34029 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval construction force command
Context triple: [Naval Construction Group 1, instanceOf, naval construction force command]
  • A. United States Navy construction force chosen
    The United States Navy construction force, commonly known as the Seabees, is a military engineering organization responsible for building and maintaining naval bases, airfields, and other critical infrastructure in support of naval and joint operations worldwide.
  • B. naval administrative office
    A naval administrative office is an organizational unit responsible for managing the paperwork, personnel records, logistics, and regulatory compliance that support the operations of a navy or naval installation.
  • C. naval command structure
    A naval command structure is the hierarchical organization of authority, responsibility, and communication within a navy that directs the planning, coordination, and execution of maritime operations.
  • D. naval shore establishment
    A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
  • E. naval design organization
    A naval design organization is an entity responsible for conceiving, developing, and integrating the technical, structural, and systems designs of naval vessels to meet specified operational, safety, and regulatory requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b4e21bc819082be98bc9ab09796 completed April 26, 2026, 6:37 p.m.
Created at: April 26, 2026, 9:12 p.m.