Triple

T26226789
Position Surface form Disambiguated ID Type / Status
Subject Shahjahanpur railway station E655911 entity
Predicate locatedOn P40 FINISHED
Object Lucknow–Bareilly line
The Lucknow–Bareilly line is a key railway route in the Indian state of Uttar Pradesh that connects the major cities of Lucknow and Bareilly, serving numerous intermediate towns and junctions.
E465598 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lucknow–Bareilly line | Statement: [Shahjahanpur railway station, locatedOn, Lucknow–Bareilly line]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lucknow–Bareilly line
Triple: [Shahjahanpur railway station, locatedOn, Lucknow–Bareilly line]
Generated description
The Lucknow–Bareilly line is a key railway route in the Indian state of Uttar Pradesh that connects the major cities of Lucknow and Bareilly, serving numerous intermediate towns and junctions.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b4a77e08190bfcb5f8ecdc55abd completed April 26, 2026, 6:36 p.m.
NER Named-entity recognition batch_69f60d53d94081909d0ae8f05e8de84c completed May 2, 2026, 2:42 p.m.
NED1 Entity disambiguation (via context triple) batch_6a11ae9f28508190953ae777a9960450 completed May 23, 2026, 1:41 p.m.
NEDg Description generation batch_6a11b29dd1a88190924fd07ab6dfa941 completed May 23, 2026, 1:58 p.m.
NED2 Entity disambiguation (via description) batch_6a11b345d944819096ecca996841404f completed May 23, 2026, 2:01 p.m.
Created at: April 26, 2026, 8:58 p.m.