Triple

T26160450
Position Surface form Disambiguated ID Type / Status
Subject Coal India Limited E660093 entity
Predicate subsidiary P258 FINISHED
Object Mahanadi Coalfields Limited
Mahanadi Coalfields Limited is a major Indian coal mining company operating primarily in Odisha and is one of the most productive subsidiaries of Coal India.
E1726036 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mahanadi Coalfields Limited | Statement: [Coal India Limited, subsidiary, Mahanadi Coalfields Limited]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mahanadi Coalfields Limited
Triple: [Coal India Limited, subsidiary, Mahanadi Coalfields Limited]
Generated description
Mahanadi Coalfields Limited is a major Indian coal mining company operating primarily in Odisha and is one of the most productive subsidiaries of Coal India.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bc5a9908190899d39ce95c6d215 completed April 26, 2026, 6:39 p.m.
NER Named-entity recognition batch_69f60c15e9848190ad5dcdb8879aadf7 completed May 2, 2026, 2:37 p.m.
NED1 Entity disambiguation (via context triple) batch_6a11ae9ba5908190ae8d9d4d61aa69a6 completed May 23, 2026, 1:41 p.m.
NEDg Description generation batch_6a11af82fb088190bee576d403827a3e completed May 23, 2026, 1:45 p.m.
NED2 Entity disambiguation (via description) batch_6a11b02a01f4819088f0f84f9ca335af completed May 23, 2026, 1:48 p.m.
Created at: April 26, 2026, 8:29 p.m.