Triple
T26121661
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Roanoke Rapids Dam |
E658986
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Roanoke River hydroelectric project
The Roanoke River hydroelectric project is a system of dams and power facilities along the Roanoke River designed to generate hydroelectric power and support regional water management.
|
E1712909
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Roanoke River hydroelectric project | Statement: [Roanoke Rapids Dam, partOf, Roanoke River hydroelectric project]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Roanoke River hydroelectric project Triple: [Roanoke Rapids Dam, partOf, Roanoke River hydroelectric project]
Generated description
The Roanoke River hydroelectric project is a system of dams and power facilities along the Roanoke River designed to generate hydroelectric power and support regional water management.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc2b2948190b458ad3f580af779 |
completed | April 26, 2026, 6:38 p.m. |
| NER | Named-entity recognition | batch_69f60acc421481909c02cdbfcc5754a4 |
completed | May 2, 2026, 2:31 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a118566c4bc8190b5f16f210d310125 |
completed | May 23, 2026, 10:45 a.m. |
| NEDg | Description generation | batch_6a1185fa85a481908ab81328b0e12145 |
completed | May 23, 2026, 10:48 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a11867ada8081908d2c617f22e79325 |
completed | May 23, 2026, 10:50 a.m. |
Created at: April 26, 2026, 8:09 p.m.