Triple
T26121653
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Roanoke Rapids Dam |
E658986
|
entity |
| Predicate | hasPowerPlant |
P9904
|
FINISHED |
| Object |
Roanoke Rapids Hydroelectric Plant
Roanoke Rapids Hydroelectric Plant is a hydroelectric power facility in North Carolina that generates electricity using water flow regulated by the Roanoke Rapids Dam on the Roanoke River.
|
E658986
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Roanoke Rapids Hydroelectric Plant | Statement: [Roanoke Rapids Dam, hasPowerPlant, Roanoke Rapids Hydroelectric Plant]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Roanoke Rapids Hydroelectric Plant Triple: [Roanoke Rapids Dam, hasPowerPlant, Roanoke Rapids Hydroelectric Plant]
Generated description
Roanoke Rapids Hydroelectric Plant is a hydroelectric power facility in North Carolina that generates electricity using water flow regulated by the Roanoke Rapids Dam on the Roanoke River.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc2b2948190b458ad3f580af779 |
completed | April 26, 2026, 6:38 p.m. |
| NER | Named-entity recognition | batch_69f60acc421481909c02cdbfcc5754a4 |
completed | May 2, 2026, 2:31 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a112759ed788190bbf086bf2b1ffef3 |
completed | May 23, 2026, 4:04 a.m. |
| NEDg | Description generation | batch_6a1152ca293c8190bb09fc8c8a22403a |
completed | May 23, 2026, 7:10 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a1153247c388190807c81edacd9ea3e |
completed | May 23, 2026, 7:11 a.m. |
Created at: April 26, 2026, 8:09 p.m.