Triple

T26073351
Position Surface form Disambiguated ID Type / Status
Subject Beloyarsk Nuclear Power Station E657609 entity
Predicate fuelCycleRole P159918 FINISHED
Object plutonium disposition and breeding LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: plutonium disposition and breeding | Statement: [Beloyarsk Nuclear Power Station, fuelCycleRole, plutonium disposition and breeding]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: fuelCycleRole
Context triple: [Beloyarsk Nuclear Power Station, fuelCycleRole, plutonium disposition and breeding]
  • A. fuelCycleFeature
    Indicates a characteristic, attribute, or aspect associated with a nuclear fuel cycle process or stage.
  • B. hasFuelCycleCapability
    Indicates that an entity possesses the technical and operational ability to carry out one or more stages of the nuclear fuel cycle (such as fuel production, use, or reprocessing).
  • C. typicalFuelCycleLength
    Indicates the usual duration of a complete fuel usage and replacement cycle for a system or process.
  • D. usesFuelCycleService
    Indicates that an entity relies on or engages a fuel cycle service (such as fuel supply, processing, or management) provided by another entity.
  • E. powerplantRole
    Indicates that one entity serves in a specific functional or operational role relative to a power plant.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bbe539081909efc7f9dd7c1b53c completed April 26, 2026, 6:38 p.m.
NER Named-entity recognition batch_69f606ccc3b8819082ca4366aaf48a70 completed May 2, 2026, 2:14 p.m.
PD Predicate disambiguation batch_69f5aff889988190ad10bcf1a280f717 completed May 2, 2026, 8:04 a.m.
PDg Predicate description generation batch_69f5f6b32a8881909baa0db57b80d56a completed May 2, 2026, 1:05 p.m.
Created at: April 26, 2026, 7:31 p.m.