Triple
T26056851
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gearrannan Blackhouse Village |
E657140
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | restored village |
C51056
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: restored village Context triple: [Gearrannan Blackhouse Village, instanceOf, restored village]
-
A.
former village
A former village is a once-inhabited settlement that has lost its status or population as a village, often due to abandonment, depopulation, or administrative reclassification.
-
B.
conservation village
A conservation village is a rural settlement designed and managed to protect and enhance natural habitats, biodiversity, and cultural heritage while supporting sustainable community living.
-
C.
village community
A village community is a small, localized social group whose members share geographic proximity, daily interactions, cultural practices, and mutual support within a rural settlement.
-
D.
Native village
A native village is a small, traditionally organized settlement inhabited primarily by an indigenous community, reflecting its cultural, social, and economic practices.
-
E.
mesa-top village
A mesa-top village is a small, often isolated settlement built on the flat summit of a mesa, taking advantage of its elevated, defensible, and panoramic terrain.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bbd788481909e22bd7153d0c037 |
completed | April 26, 2026, 6:38 p.m. |
Created at: April 26, 2026, 7:11 p.m.