Triple

T25894860
Position Surface form Disambiguated ID Type / Status
Subject Morgan County, Missouri E652439 entity
Predicate roadServedBy P385 FINISHED
Object Missouri Route 135
Missouri Route 135 is a state highway in central Missouri that runs through rural areas including Morgan County, connecting small communities and providing access to nearby lakes and recreational areas.
E1785768 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri Route 135 | Statement: [Morgan County, Missouri, roadServedBy, Missouri Route 135]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Missouri Route 135
Triple: [Morgan County, Missouri, roadServedBy, Missouri Route 135]
Generated description
Missouri Route 135 is a state highway in central Missouri that runs through rural areas including Morgan County, connecting small communities and providing access to nearby lakes and recreational areas.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab3c6cc081908de59bfcc28ec19d completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f60382d4648190819e373a0880b74c completed May 2, 2026, 2 p.m.
NED1 Entity disambiguation (via context triple) batch_6a12e429880481909b189e689009be76 completed May 24, 2026, 11:42 a.m.
NEDg Description generation batch_6a12e4fbf9cc8190b5bbff117668f81a completed May 24, 2026, 11:46 a.m.
NED2 Entity disambiguation (via description) batch_6a12e5cfee048190a139532d8e125411 completed May 24, 2026, 11:49 a.m.
Created at: April 22, 2026, 8:22 a.m.