Triple

T25885126
Position Surface form Disambiguated ID Type / Status
Subject SAARC Highway Corridor E652166 entity
Predicate instanceOf P0 FINISHED
Object road network project C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road network project
Context triple: [SAARC Highway Corridor, instanceOf, road network project]
  • A. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • B. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • C. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • D. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • E. road endpoint
    A road endpoint is a location where a road segment terminates, either by connecting to another road, transitioning into a different type of pathway, or ending without continuation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab3b92cc81908febd90317862647 completed April 21, 2026, 4:52 p.m.
Created at: April 22, 2026, 8:17 a.m.