Triple
T25842533
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SEA 1180 Phase 1 |
E650974
|
entity |
| Predicate | shipbuilder |
P159340
|
FINISHED |
| Object |
ASC
ASC is an Australian government-owned shipbuilding company best known for constructing and maintaining naval vessels for the Royal Australian Navy.
|
E650969
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ASC | Statement: [SEA 1180 Phase 1, shipbuilder, ASC]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: ASC Triple: [SEA 1180 Phase 1, shipbuilder, ASC]
Generated description
ASC is an Australian government-owned shipbuilding company best known for constructing and maintaining naval vessels for the Royal Australian Navy.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: shipbuilder Context triple: [SEA 1180 Phase 1, shipbuilder, ASC]
-
A.
shipbuildingActivity
Indicates the activity or process of constructing, assembling, or significantly modifying ships or large watercraft.
-
B.
shipyard
Indicates a relationship where a location functions as a facility for building, repairing, or maintaining ships.
-
C.
commissionedShip
Indicates that a ship has been formally placed into active service, typically following its construction or acquisition.
-
D.
shipDesigned
Indicates that one entity is responsible for designing or creating the design of a ship associated with another entity.
-
E.
shipTypeProduced
Indicates that a particular type of ship is produced, built, or manufactured by a given entity.
- F. None of above. chosen
Provenance (7 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab38086081908f3a8e7e0c6efd83 |
completed | April 21, 2026, 4:52 p.m. |
| NER | Named-entity recognition | batch_69f6023564c08190a719144479d6a1b2 |
completed | May 2, 2026, 1:55 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a10da324794819098bd5bc0e18e16c1 |
completed | May 22, 2026, 10:35 p.m. |
| NEDg | Description generation | batch_6a10dadc94ac819093dcd582156e6705 |
completed | May 22, 2026, 10:38 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a10db3bac4c81908662fb96783d2612 |
completed | May 22, 2026, 10:39 p.m. |
| PD | Predicate disambiguation | batch_69f4938b960081909b53c074a3e0c7c2 |
completed | May 1, 2026, 11:50 a.m. |
| PDg | Predicate description generation | batch_69f497b8abb88190bb672cf6907c4b8d |
completed | May 1, 2026, 12:08 p.m. |
Created at: April 22, 2026, 7:50 a.m.