Triple

T25832523
Position Surface form Disambiguated ID Type / Status
Subject Nieuwe Keizersgracht E650702 entity
Predicate instanceOf P0 FINISHED
Object waterway in Amsterdam C47694 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: waterway in Amsterdam
Context triple: [Nieuwe Keizersgracht, instanceOf, waterway in Amsterdam]
  • A. river in the Netherlands
    A river in the Netherlands is a natural flowing watercourse within Dutch territory that shapes the lowland landscape, supports ecosystems, and serves as a vital route for transport, water management, and economic activity.
  • B. canal in Amsterdam chosen
    A canal in Amsterdam is a man-made waterway lined with historic buildings, bridges, and houseboats, forming part of the city's iconic concentric ring network used for transport, drainage, and recreation.
  • C. bridge in the Netherlands
    A bridge in the Netherlands is a constructed structure that spans physical obstacles such as waterways, roads, or railways to support transportation and connectivity within the Dutch landscape.
  • D. Dutch water board
    A Dutch water board is a regional government body responsible for managing water levels, flood protection, water quality, and wastewater treatment within its designated area in the Netherlands.
  • E. port of the Netherlands
    A port of the Netherlands is a maritime facility located along the Dutch coastline or inland waterways that supports the docking, loading, unloading, storage, and transit of goods and passengers within national and international shipping networks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab37438081908f1ccf6284839520 completed April 21, 2026, 4:52 p.m.
Created at: April 22, 2026, 7:39 a.m.