Triple

T25820456
Position Surface form Disambiguated ID Type / Status
Subject USS Columbia (SSBN-826) E650387 entity
Predicate builder P3143 FINISHED
Object General Dynamics Electric Boat
General Dynamics Electric Boat is a major American shipbuilding company specializing in the design and construction of nuclear-powered submarines for the U.S. Navy.
E167761 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: General Dynamics Electric Boat | Statement: [USS Columbia (SSBN-826), builder, General Dynamics Electric Boat]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: General Dynamics Electric Boat
Triple: [USS Columbia (SSBN-826), builder, General Dynamics Electric Boat]
Generated description
General Dynamics Electric Boat is a major American shipbuilding company specializing in the design and construction of nuclear-powered submarines for the U.S. Navy.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e7ab367fcc8190a5ff1e7f3da046a4 completed April 21, 2026, 4:52 p.m.
NER Named-entity recognition batch_69f601909ea481909674a1438dede725 completed May 2, 2026, 1:52 p.m.
NED1 Entity disambiguation (via context triple) batch_6a11ae901a3481909860d13535ab3a4a completed May 23, 2026, 1:41 p.m.
NEDg Description generation batch_6a11af9c1be081909d2e461e3da596d6 completed May 23, 2026, 1:46 p.m.
NED2 Entity disambiguation (via description) batch_6a11b051d328819090f947755dda4cfc completed May 23, 2026, 1:49 p.m.
Created at: April 22, 2026, 7:29 a.m.