Triple

T25453346
Position Surface form Disambiguated ID Type / Status
Subject Badarpur Junction E637845 entity
Predicate locatedOn P40 FINISHED
Object Badarpur–Karimganj line
The Badarpur–Karimganj line is a railway route in the northeastern Indian state of Assam that connects the town of Badarpur with Karimganj, serving as an important regional transport link.
E1706349 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Badarpur–Karimganj line | Statement: [Badarpur Junction, locatedOn, Badarpur–Karimganj line]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Badarpur–Karimganj line
Triple: [Badarpur Junction, locatedOn, Badarpur–Karimganj line]
Generated description
The Badarpur–Karimganj line is a railway route in the northeastern Indian state of Assam that connects the town of Badarpur with Karimganj, serving as an important regional transport link.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75db7c5048190b8da9cd7eeedb610 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f5f70885cc81909f1574406d67c682 completed May 2, 2026, 1:07 p.m.
NED1 Entity disambiguation (via context triple) batch_6a111ae6201881909683cf3986272983 completed May 23, 2026, 3:11 a.m.
NEDg Description generation batch_6a111ba170c881908916feb646df7338 completed May 23, 2026, 3:14 a.m.
NED2 Entity disambiguation (via description) batch_6a111c1129588190918ec8f98cad6fd4 completed May 23, 2026, 3:16 a.m.
Created at: April 21, 2026, 2:03 p.m.