Triple

T25393060
Position Surface form Disambiguated ID Type / Status
Subject Lahore Junction railway station E636218 entity
Predicate secondaryModeServed P1533 FINISHED
Object commuter rail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: commuter rail | Statement: [Lahore Junction railway station, secondaryModeServed, commuter rail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: secondaryModeServed
Context triple: [Lahore Junction railway station, secondaryModeServed, commuter rail]
  • A. secondaryTo
    Indicates that one condition, event, or factor occurs as a consequence of, or is caused by, another primary condition, event, or factor.
  • B. secondaryFunction
    Indicates that an entity has an additional, supporting role or purpose beyond its primary function.
  • C. secondaryHub
    Indicates that an entity functions as a secondary or backup hub in relation to a primary hub within a network or system.
  • D. servesMode chosen
    Indicates that one entity provides or operates in a particular manner, method, or mode in relation to another entity or context.
  • E. secondaryState
    Indicates that an entity is in a subordinate or less primary condition, status, or mode relative to its main or primary state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75db263888190b77fff9e2827b9a2 completed April 21, 2026, 11:21 a.m.
NER Named-entity recognition batch_69f69383222c81909d8baa04129d5c81 completed May 3, 2026, 12:14 a.m.
PD Predicate disambiguation batch_69f690eb1e948190aab41a89969519a5 completed May 3, 2026, 12:03 a.m.
Created at: April 21, 2026, 1:49 p.m.