Triple

T25331628
Position Surface form Disambiguated ID Type / Status
Subject Ganga–Hooghly water diversion E635165 entity
Predicate relatedTo P37 FINISHED
Object Farakka Barrage Project
The Farakka Barrage Project is a major Indian river engineering scheme built on the Ganges to regulate flow and divert water toward the Hooghly River for navigation, irrigation, and port maintenance.
E1695929 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Farakka Barrage Project | Statement: [Ganga–Hooghly water diversion, relatedTo, Farakka Barrage Project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Farakka Barrage Project
Triple: [Ganga–Hooghly water diversion, relatedTo, Farakka Barrage Project]
Generated description
The Farakka Barrage Project is a major Indian river engineering scheme built on the Ganges to regulate flow and divert water toward the Hooghly River for navigation, irrigation, and port maintenance.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9908108190a95427a97020632a completed April 21, 2026, 11:08 a.m.
NER Named-entity recognition batch_69f497c5f86c81908cf1ce29669bafbe completed May 1, 2026, 12:08 p.m.
NED1 Entity disambiguation (via context triple) batch_6a10d9e414848190a387e80a98ed9dea completed May 22, 2026, 10:34 p.m.
NEDg Description generation batch_6a10da9b545081908e5837e1de98fe40 completed May 22, 2026, 10:37 p.m.
NED2 Entity disambiguation (via description) batch_6a10db0f7a608190ae0c34f6f6ce0ad8 completed May 22, 2026, 10:39 p.m.
Created at: April 21, 2026, 1:30 p.m.