Triple

T25284236
Position Surface form Disambiguated ID Type / Status
Subject Makwanpur District E633893 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Kulekhani Hydropower Project
Kulekhani Hydropower Project is a major storage-type hydroelectric power plant in Nepal, notable for being the country’s first reservoir-based hydropower facility.
E1672801 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kulekhani Hydropower Project | Statement: [Makwanpur District, hasHydropowerProject, Kulekhani Hydropower Project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kulekhani Hydropower Project
Triple: [Makwanpur District, hasHydropowerProject, Kulekhani Hydropower Project]
Generated description
Kulekhani Hydropower Project is a major storage-type hydroelectric power plant in Nepal, notable for being the country’s first reservoir-based hydropower facility.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75a9402fc81909362ca85277c06d9 completed April 21, 2026, 11:08 a.m.
NER Named-entity recognition batch_69f48e0800a881909bf6099d120338a5 completed May 1, 2026, 11:27 a.m.
NED1 Entity disambiguation (via context triple) batch_6a1068032d9481909f5f274ed6fa1661 completed May 22, 2026, 2:28 p.m.
NEDg Description generation batch_6a106940a70c81909a15eb7e78b00f0a completed May 22, 2026, 2:33 p.m.
NED2 Entity disambiguation (via description) batch_6a106a510e208190894bcbb3d36b92dd completed May 22, 2026, 2:38 p.m.
Created at: April 21, 2026, 1:19 p.m.