Triple

T25124070
Position Surface form Disambiguated ID Type / Status
Subject Kosi Mahasetu E629345 entity
Predicate instanceOf P0 FINISHED
Object mega bridge C49753 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mega bridge
Context triple: [Kosi Mahasetu, instanceOf, mega bridge]
  • A. multipurpose bridge
    A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
  • B. modern bridge
    A modern bridge is a contemporary engineered structure designed to efficiently span physical obstacles such as water, valleys, or roads using advanced materials and construction techniques to support transportation and connectivity.
  • C. multi-span bridge
    A multi-span bridge is a bridge structure composed of multiple consecutive spans supported by intermediate piers or supports, allowing it to cross longer distances or multiple obstacles.
  • D. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • E. double-decked bridge
    A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff3288048190bd82c3b7f7bd0e62 completed April 18, 2026, 3:49 a.m.
Created at: April 18, 2026, 6:28 a.m.