Triple

T25022836
Position Surface form Disambiguated ID Type / Status
Subject Volgodonsk E626624 entity
Predicate hasFacility P105 FINISHED
Object Rostov Nuclear Power Plant
The Rostov Nuclear Power Plant is a major Russian nuclear power station located near Volgodonsk that generates electricity for the surrounding region and contributes significantly to the national power grid.
E1662969 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rostov Nuclear Power Plant | Statement: [Volgodonsk, hasFacility, Rostov Nuclear Power Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Rostov Nuclear Power Plant
Triple: [Volgodonsk, hasFacility, Rostov Nuclear Power Plant]
Generated description
The Rostov Nuclear Power Plant is a major Russian nuclear power station located near Volgodonsk that generates electricity for the surrounding region and contributes significantly to the national power grid.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2ff28ee3881909c626af002457a4a completed April 18, 2026, 3:48 a.m.
NER Named-entity recognition batch_69f44f672d50819094261f5522c939e4 completed May 1, 2026, 6:59 a.m.
NED1 Entity disambiguation (via context triple) batch_6a1048b7b7f48190a0ec6fc8ad1246cf completed May 22, 2026, 12:14 p.m.
NEDg Description generation batch_6a104a6d40f88190941fae4e53c175f7 completed May 22, 2026, 12:22 p.m.
NED2 Entity disambiguation (via description) batch_6a104c2d8308819097b21b979944585e completed May 22, 2026, 12:29 p.m.
Created at: April 18, 2026, 6:07 a.m.