Triple

T24657119
Position Surface form Disambiguated ID Type / Status
Subject Nurek E610422 entity
Predicate hasNearby P350 FINISHED
Object Nurek Hydroelectric Power Plant
Nurek Hydroelectric Power Plant is a major Soviet-era dam and hydroelectric station on the Vakhsh River in Tajikistan, long known as one of the tallest dams in the world and a key source of the country’s electricity.
E604716 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nurek Hydroelectric Power Plant | Statement: [Nurek, hasNearby, Nurek Hydroelectric Power Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Nurek Hydroelectric Power Plant
Triple: [Nurek, hasNearby, Nurek Hydroelectric Power Plant]
Generated description
Nurek Hydroelectric Power Plant is a major Soviet-era dam and hydroelectric station on the Vakhsh River in Tajikistan, long known as one of the tallest dams in the world and a key source of the country’s electricity.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4d453248190a020354e93ef6282 completed April 17, 2026, 11:40 p.m.
NER Named-entity recognition batch_69f40f9612b48190909dc8a6064a8f08 completed May 1, 2026, 2:27 a.m.
NED1 Entity disambiguation (via context triple) batch_6a105cbffe4081908027b7e51417f305 completed May 22, 2026, 1:40 p.m.
NEDg Description generation batch_6a1060b521b08190849da88711bbfce7 completed May 22, 2026, 1:57 p.m.
NED2 Entity disambiguation (via description) batch_6a1061596fd08190a0a5c2d7a5fb5177 completed May 22, 2026, 1:59 p.m.
Created at: April 18, 2026, 2:34 a.m.