Triple

T24571556
Position Surface form Disambiguated ID Type / Status
Subject Arigna coal mining area E607974 entity
Predicate associatedWith P37 FINISHED
Object Arigna power station
Arigna power station was a peat- and coal-fired electricity generating plant in County Roscommon, Ireland, that played a key role in the region’s industrial and energy history before its closure.
E1655228 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arigna power station | Statement: [Arigna coal mining area, associatedWith, Arigna power station]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Arigna power station
Triple: [Arigna coal mining area, associatedWith, Arigna power station]
Generated description
Arigna power station was a peat- and coal-fired electricity generating plant in County Roscommon, Ireland, that played a key role in the region’s industrial and energy history before its closure.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4cdab6c8190aae6e5d3de55c95e completed April 17, 2026, 11:39 p.m.
NER Named-entity recognition batch_69f2a9257ccc81908efcd9d047772492 completed April 30, 2026, 12:58 a.m.
NED1 Entity disambiguation (via context triple) batch_6a1032e9607c819096b8712453256eb0 completed May 22, 2026, 10:41 a.m.
NEDg Description generation batch_6a1033999eb8819093313456a2a6fb1b completed May 22, 2026, 10:44 a.m.
NED2 Entity disambiguation (via description) batch_6a10344ac26c81908a031f43caf710b5 completed May 22, 2026, 10:47 a.m.
Created at: April 18, 2026, 2:28 a.m.