Triple

T24568781
Position Surface form Disambiguated ID Type / Status
Subject Fierza Hydroelectric Power Station E607871 entity
Predicate reservoirName P13043 FINISHED
Object Lake Fierza
Lake Fierza is a large artificial reservoir in northern Albania, formed by damming the Drin River and serving as a key component of the country’s hydroelectric power system.
E2083512 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lake Fierza | Statement: [Fierza Hydroelectric Power Station, reservoirName, Lake Fierza]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Lake Fierza
Triple: [Fierza Hydroelectric Power Station, reservoirName, Lake Fierza]
Generated description
Lake Fierza is a large artificial reservoir in northern Albania, formed by damming the Drin River and serving as a key component of the country’s hydroelectric power system.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4cc35a48190990b7571bc086df8 completed April 17, 2026, 11:39 p.m.
NER Named-entity recognition batch_69f2a9225d9c8190ae92e5540f6c45c2 completed April 30, 2026, 12:58 a.m.
NED1 Entity disambiguation (via context triple) batch_6a36c1a228a88190a6adca7f1ca112b9 completed June 20, 2026, 4:36 p.m.
NEDg Description generation batch_6a36c328ba788190ac5f7e0d59cedcff completed June 20, 2026, 4:43 p.m.
NED2 Entity disambiguation (via description) batch_6a36c3da25608190b47fdf74705560bc completed June 20, 2026, 4:46 p.m.
Created at: April 18, 2026, 2:28 a.m.