Triple

T24452260
Position Surface form Disambiguated ID Type / Status
Subject Lewiston–Clarkston metropolitan area E616576 entity
Predicate containsCounty P5971 FINISHED
Object Asotin County, Washington E474122 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Asotin County, Washington | Statement: [Lewiston–Clarkston metropolitan area, containsCounty, Asotin County, Washington]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7edca608190aafefc8877a1b4da completed April 18, 2026, 1:01 a.m.
NER Named-entity recognition batch_69f2985848748190ae0e436b2e83f249 completed April 29, 2026, 11:46 p.m.
NED1 Entity disambiguation (via context triple) batch_6a2b2d566d808190be1a912f41a10309 completed June 11, 2026, 9:49 p.m.
Created at: April 18, 2026, 2:18 a.m.