Triple

T24389611
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 13 corridor E614849 entity
Predicate parallels P1868 FINISHED
Object U.S. Route 1 corridor in parts of the Mid-Atlantic
The U.S. Route 1 corridor in parts of the Mid-Atlantic is a major north–south transportation and development spine linking key urban and suburban areas between the Northeast and the Southeast.
E1632794 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1 corridor in parts of the Mid-Atlantic | Statement: [U.S. Route 13 corridor, parallels, U.S. Route 1 corridor in parts of the Mid-Atlantic]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: U.S. Route 1 corridor in parts of the Mid-Atlantic
Triple: [U.S. Route 13 corridor, parallels, U.S. Route 1 corridor in parts of the Mid-Atlantic]
Generated description
The U.S. Route 1 corridor in parts of the Mid-Atlantic is a major north–south transportation and development spine linking key urban and suburban areas between the Northeast and the Southeast.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e509b88190a53155d4f3de45ce completed April 18, 2026, 1:01 a.m.
NER Named-entity recognition batch_69f29457a0d08190ad19b55625d7a437 completed April 29, 2026, 11:29 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0fd68040b4819083bd2f0510e7aea6 completed May 22, 2026, 4:07 a.m.
NEDg Description generation batch_6a0fd757847081909f0c5e77d4dd97c7 completed May 22, 2026, 4:11 a.m.
NED2 Entity disambiguation (via description) batch_6a0fd87ea3648190923d6f14c978f461 completed May 22, 2026, 4:15 a.m.
Created at: April 18, 2026, 2:04 a.m.