Triple

T24353825
Position Surface form Disambiguated ID Type / Status
Subject Gort E613865 entity
Predicate railwayLine P848 FINISHED
Object Western Rail Corridor
The Western Rail Corridor is a regional railway route in western Ireland intended to connect cities and towns from Limerick to Sligo, parts of which have been reopened for passenger services after long periods of disuse.
E1631679 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Western Rail Corridor | Statement: [Gort, railwayLine, Western Rail Corridor]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Western Rail Corridor
Triple: [Gort, railwayLine, Western Rail Corridor]
Generated description
The Western Rail Corridor is a regional railway route in western Ireland intended to connect cities and towns from Limerick to Sligo, parts of which have been reopened for passenger services after long periods of disuse.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7ddd29481909e7f539a6072bd71 completed April 18, 2026, 1:01 a.m.
NER Named-entity recognition batch_69f2934732908190a50e69f492a5dc7a completed April 29, 2026, 11:24 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0fd6672ec081909a8dcd6d48644659 completed May 22, 2026, 4:07 a.m.
NEDg Description generation batch_6a0fd76f32f081908122da8e6064e205 completed May 22, 2026, 4:11 a.m.
NED2 Entity disambiguation (via description) batch_6a0fd8e99d58819091ad4bf05fdb101a completed May 22, 2026, 4:17 a.m.
Created at: April 18, 2026, 1:59 a.m.