Triple

T24004802
Position Surface form Disambiguated ID Type / Status
Subject Baltimore and Ohio Railroad locomotives E594341 entity
Predicate notableExample P1503 FINISHED
Object B&O Lafayette
B&O Lafayette was an early 19th-century steam locomotive of the Baltimore and Ohio Railroad, notable for its pioneering design that influenced subsequent American locomotive development.
E1616904 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: B&O Lafayette | Statement: [Baltimore and Ohio Railroad locomotives, notableExample, B&O Lafayette]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: B&O Lafayette
Triple: [Baltimore and Ohio Railroad locomotives, notableExample, B&O Lafayette]
Generated description
B&O Lafayette was an early 19th-century steam locomotive of the Baltimore and Ohio Railroad, notable for its pioneering design that influenced subsequent American locomotive development.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288b9ecf08190b8c94a278f5674fe completed April 17, 2026, 7:23 p.m.
NER Named-entity recognition batch_69f1d4681fd88190949c5c91d4f94910 completed April 29, 2026, 9:50 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0f9648a2c881908235996dff97b71a completed May 21, 2026, 11:33 p.m.
NEDg Description generation batch_6a0f98f504788190b275d9ff82d9b5b0 completed May 21, 2026, 11:44 p.m.
NED2 Entity disambiguation (via description) batch_6a0f997a08a88190bceafde08c961a3e completed May 21, 2026, 11:47 p.m.
Created at: April 17, 2026, 9:40 p.m.