Triple

T23806187
Position Surface form Disambiguated ID Type / Status
Subject Railway Technical Centre, Derby E589713 entity
Predicate historicallyAssociatedWith P2830 FINISHED
Object British Rail Research Division
The British Rail Research Division was the central research and development arm of British Rail, responsible for pioneering advances in railway engineering, operations, and technology in the UK.
E143329 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British Rail Research Division | Statement: [Railway Technical Centre, Derby, historicallyAssociatedWith, British Rail Research Division]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: British Rail Research Division
Triple: [Railway Technical Centre, Derby, historicallyAssociatedWith, British Rail Research Division]
Generated description
The British Rail Research Division was the central research and development arm of British Rail, responsible for pioneering advances in railway engineering, operations, and technology in the UK.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d19fecc8190a5cf39bbb18d5d7f completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1c75206a88190b6e35da289471c27 completed April 29, 2026, 8:54 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0f760e50488190ad156ea68e65a551 completed May 21, 2026, 9:15 p.m.
NEDg Description generation batch_6a0f76cc78748190b0f22716094bba19 completed May 21, 2026, 9:19 p.m.
NED2 Entity disambiguation (via description) batch_6a0f77541b948190bb866a8c7c6f5ca9 completed May 21, 2026, 9:21 p.m.
Created at: April 17, 2026, 7:56 p.m.