Triple

T23669979
Position Surface form Disambiguated ID Type / Status
Subject Nalcor Energy E584701 entity
Predicate notableProject P4 FINISHED
Object Muskrat Falls hydroelectric project
The Muskrat Falls hydroelectric project is a large-scale hydroelectric development on the lower Churchill River in Labrador, Canada, built to generate renewable electricity and supply power to Newfoundland and beyond.
E1612172 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Muskrat Falls hydroelectric project | Statement: [Nalcor Energy, notableProject, Muskrat Falls hydroelectric project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Muskrat Falls hydroelectric project
Triple: [Nalcor Energy, notableProject, Muskrat Falls hydroelectric project]
Generated description
The Muskrat Falls hydroelectric project is a large-scale hydroelectric development on the lower Churchill River in Labrador, Canada, built to generate renewable electricity and supply power to Newfoundland and beyond.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24901421881908c17a5293bdd4a8e completed April 17, 2026, 2:51 p.m.
NER Named-entity recognition batch_69f1b40dc0ec8190b558e30dbebf491f completed April 29, 2026, 7:32 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0f7e4baae08190bd8dc84d9220be24 completed May 21, 2026, 9:51 p.m.
NEDg Description generation batch_6a0f7f4ce09081908de47029b8ffc097 completed May 21, 2026, 9:55 p.m.
NED2 Entity disambiguation (via description) batch_6a0f7fe7f7248190a377212661dd56b1 completed May 21, 2026, 9:58 p.m.
Created at: April 17, 2026, 6:50 p.m.