Triple

T23634623
Position Surface form Disambiguated ID Type / Status
Subject Lake Dunstan E583706 entity
Predicate isReservoirFor P11309 FINISHED
Object Clyde Dam power station
Clyde Dam power station is a major hydroelectric facility in Central Otago, New Zealand, generating power from the Clutha River via the Clyde Dam and its associated reservoir.
E1595143 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Clyde Dam power station | Statement: [Lake Dunstan, isReservoirFor, Clyde Dam power station]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Clyde Dam power station
Triple: [Lake Dunstan, isReservoirFor, Clyde Dam power station]
Generated description
Clyde Dam power station is a major hydroelectric facility in Central Otago, New Zealand, generating power from the Clutha River via the Clyde Dam and its associated reservoir.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e248fe1c2c8190ac914d2442ff3d26 completed April 17, 2026, 2:51 p.m.
NER Named-entity recognition batch_69f1b1eb38a481909f7ceeaefb7b43ce completed April 29, 2026, 7:23 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0f45a2c05c8190a8de0be177c0f0f3 completed May 21, 2026, 5:49 p.m.
NEDg Description generation batch_6a0f46faaa5481909c99edb4bdd30049 completed May 21, 2026, 5:55 p.m.
NED2 Entity disambiguation (via description) batch_6a0f484988d081909280fe863dc80e30 completed May 21, 2026, 6 p.m.
Created at: April 17, 2026, 6:47 p.m.