Triple

T23528725
Position Surface form Disambiguated ID Type / Status
Subject Niedzica Dam E576502 entity
Predicate hasPowerPlant P9904 FINISHED
Object Niedzica Hydroelectric Power Plant
The Niedzica Hydroelectric Power Plant is a hydroelectric facility in southern Poland that generates electricity using water impounded by the Niedzica Dam on the Dunajec River.
E1592250 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Niedzica Hydroelectric Power Plant | Statement: [Niedzica Dam, hasPowerPlant, Niedzica Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Niedzica Hydroelectric Power Plant
Context triple: [Niedzica Dam, hasPowerPlant, Niedzica Hydroelectric Power Plant]
  • A. Lipno I Hydroelectric Power Station
    Lipno I Hydroelectric Power Station is a major hydroelectric facility in the Czech Republic that generates electricity using water from the Lipno Reservoir on the Vltava River.
  • B. Solina Hydroelectric Power Plant
    The Solina Hydroelectric Power Plant is a major Polish hydroelectric facility in the Bieszczady region, generating electricity from the reservoir created by the Solina Dam on the San River.
  • C. Orava Hydroelectric Power Plant
    Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
  • D. Svetogorsk hydropower plant
    Svetogorsk hydropower plant is a hydroelectric power station located on the Vuoksi River in Russia, generating electricity by harnessing the river’s flow.
  • E. Warsak Hydropower Station
    Warsak Hydropower Station is a major hydroelectric power plant in Pakistan that generates electricity from the Kabul River to supply the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Niedzica Hydroelectric Power Plant
Triple: [Niedzica Dam, hasPowerPlant, Niedzica Hydroelectric Power Plant]
Generated description
The Niedzica Hydroelectric Power Plant is a hydroelectric facility in southern Poland that generates electricity using water impounded by the Niedzica Dam on the Dunajec River.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f5a8848190a2ba42e271c6c31f completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1ac758038819098f5f597be39274e completed April 29, 2026, 7 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0cdf53c66c819087f1e9481dcfc8ee completed May 19, 2026, 10:08 p.m.
NEDg Description generation batch_6a0ce4602a408190b4357d98cf16477a completed May 19, 2026, 10:29 p.m.
NED2 Entity disambiguation (via description) batch_6a0d721bdae08190a06f48a6073c5351 completed May 20, 2026, 8:34 a.m.
Created at: April 17, 2026, 6:09 p.m.