Triple
T23491601
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chicago River bridges |
E570690
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object |
Van Buren Street Bridge
The Van Buren Street Bridge is a bascule bridge in downtown Chicago that carries Van Buren Street across the Chicago River, serving as part of the city's historic movable bridge system.
|
E1763175
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Van Buren Street Bridge | Statement: [Chicago River bridges, hasPart, Van Buren Street Bridge]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Van Buren Street Bridge Triple: [Chicago River bridges, hasPart, Van Buren Street Bridge]
Generated description
The Van Buren Street Bridge is a bascule bridge in downtown Chicago that carries Van Buren Street across the Chicago River, serving as part of the city's historic movable bridge system.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245b0b01481908f636939bedd804c |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f1a7dc631c819099027e3a1c755a66 |
completed | April 29, 2026, 6:40 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a126239807881908843eaced3181240 |
completed | May 24, 2026, 2:28 a.m. |
| NEDg | Description generation | batch_6a12667d95ec8190900555e50d903e5d |
completed | May 24, 2026, 2:46 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a1266dd3b748190a06a76a7587eff99 |
completed | May 24, 2026, 2:47 a.m. |
Created at: April 17, 2026, 6:04 p.m.