Triple

T23471718
Position Surface form Disambiguated ID Type / Status
Subject Kajaki Dam E570146 entity
Predicate hasTurbine P32979 FINISHED
Object Unit 3
Unit 3 is a hydroelectric generating turbine unit at Afghanistan’s Kajaki Dam, contributing to the dam’s power production capacity.
E1589933 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Unit 3 | Statement: [Kajaki Dam, hasTurbine, Unit 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Unit 3
Context triple: [Kajaki Dam, hasTurbine, Unit 3]
  • A. Unit 2
    Unit 2 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, part of one of the world’s largest nuclear generating stations.
  • B. Unit 2
    Unit 2 is the second coal-fired generating unit of the Port Qasim Coal Power Project in Pakistan, contributing a significant share of the plant’s total electricity output.
  • C. Unit 5
    Unit 5 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, contributing to its electricity generation capacity.
  • D. Unit 6
    Unit 6 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
  • E. Unit 7
    Unit 7 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Unit 3
Triple: [Kajaki Dam, hasTurbine, Unit 3]
Generated description
Unit 3 is a hydroelectric generating turbine unit at Afghanistan’s Kajaki Dam, contributing to the dam’s power production capacity.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Unit 3
Target entity description: Unit 3 is a hydroelectric generating turbine unit at Afghanistan’s Kajaki Dam, contributing to the dam’s power production capacity.
  • A. Unit 2
    Unit 2 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, part of one of the world’s largest nuclear generating stations.
  • B. Unit 2
    Unit 2 is the second coal-fired generating unit of the Port Qasim Coal Power Project in Pakistan, contributing a significant share of the plant’s total electricity output.
  • C. Unit 5
    Unit 5 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, contributing to its electricity generation capacity.
  • D. Unit 6
    Unit 6 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
  • E. Unit 7
    Unit 7 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245af8a88819084f2704f6d265a92 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a700bd0481908047aa4678217cbd completed April 29, 2026, 6:36 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0c825dcbdc819090002d36ef823a2f completed May 19, 2026, 3:31 p.m.
NEDg Description generation batch_6a0ca6efb0d88190bf15b18cc3f12482 completed May 19, 2026, 6:07 p.m.
NED2 Entity disambiguation (via description) batch_6a0ca819f6dc8190852bb3c06768ac5a completed May 19, 2026, 6:12 p.m.
Created at: April 17, 2026, 5:55 p.m.