Triple

T23196050
Position Surface form Disambiguated ID Type / Status
Subject British Rail second-generation DMUs E579870 entity
Predicate includes class P131580 FINISHED
Object British Rail Class 17x
British Rail Class 17x refers to a family of second-generation diesel multiple units introduced for regional and commuter services on the British railway network.
E1768726 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British Rail Class 17x | Statement: [British Rail second-generation DMUs, includes class, British Rail Class 17x]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: British Rail Class 17x
Triple: [British Rail second-generation DMUs, includes class, British Rail Class 17x]
Generated description
British Rail Class 17x refers to a family of second-generation diesel multiple units introduced for regional and commuter services on the British railway network.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24600eed08190bd7e5295653a1503 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f18fdb279c81908dcc46f2786a86cd completed April 29, 2026, 4:58 a.m.
NED1 Entity disambiguation (via context triple) batch_6a12a7a1e53081908e89c77a8231a5e6 completed May 24, 2026, 7:24 a.m.
NEDg Description generation batch_6a12a81054a0819082a8d81a803e9d5c completed May 24, 2026, 7:26 a.m.
NED2 Entity disambiguation (via description) batch_6a12a84e1fc88190b93efc6dd11de7bd completed May 24, 2026, 7:27 a.m.
Created at: April 17, 2026, 4:06 p.m.