Triple

T23057654
Position Surface form Disambiguated ID Type / Status
Subject Trg pet bunara E574201 entity
Predicate near P350 FINISHED
Object Zadar waterfront E578581 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zadar waterfront | Statement: [Trg pet bunara, near, Zadar waterfront]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zadar waterfront
Context triple: [Trg pet bunara, near, Zadar waterfront]
  • A. Zadar waterfront promenade chosen
    The Zadar waterfront promenade is a scenic seaside walkway in Zadar, Croatia, renowned for its modern art installations, sea views, and vibrant sunset atmosphere.
  • B. Zadar
    Zadar is a historic coastal city in Croatia on the Adriatic Sea, known for its Roman and Venetian ruins, medieval churches, and modern seaside installations like the Sea Organ.
  • C. Port of Zadar
    The Port of Zadar is a key Croatian Adriatic seaport serving passenger ferries, cargo traffic, and tourism for the city of Zadar and its surrounding islands.
  • D. Rovinj harbor
    Rovinj harbor is a picturesque coastal inlet in the Croatian town of Rovinj, known for its colorful waterfront, fishing boats, and views of the historic old town.
  • E. Port of Split
    The Port of Split is a major Croatian seaport on the Adriatic Sea, serving as a key passenger and cargo hub and the main gateway to the Dalmatian islands.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245ba7ae48190be606dbc54120e39 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f18681bec48190a8226b3d89d19b9f completed April 29, 2026, 4:18 a.m.
NED1 Entity disambiguation (via context triple) batch_6a0cdf25682081908ff6ee0b898a861a completed May 19, 2026, 10:07 p.m.
Created at: April 17, 2026, 3:55 p.m.