Triple

T23008870
Position Surface form Disambiguated ID Type / Status
Subject Intentional Programming E572852 entity
Predicate instanceOf P0 FINISHED
Object programming methodology C15971 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: programming methodology
Context triple: [Intentional Programming, instanceOf, programming methodology]
  • A. software development methodology
    A software development methodology is a structured framework of principles, practices, and processes that guides how software is planned, designed, built, tested, and delivered.
  • B. programming paradigm chosen
    A programming paradigm is a fundamental style or approach to computer programming that shapes how developers structure, organize, and reason about code and computation.
  • C. software engineering guideline
    A software engineering guideline is a documented recommendation or best practice that directs how software should be designed, developed, tested, and maintained to ensure quality, consistency, and efficiency.
  • D. management methodology
    A management methodology is a structured, repeatable approach that guides how organizations plan, execute, monitor, and improve their work to achieve strategic and operational goals.
  • E. productivity methodology
    A productivity methodology is a structured approach or system of principles, practices, and tools designed to help individuals or teams manage time, tasks, and energy more effectively to achieve goals efficiently.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b764cc8190a51be76f1d9611e1 completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 3:51 p.m.